10mm DC 5V 2-Phase 4-Wire Linear Stepper Motor with Long Lead Shaft Rod for Precision Movement Applications

€32.95
FREE Shipping

10mm DC 5V 2-Phase 4-Wire Linear Stepper Motor with Long Lead Shaft Rod for Precision Movement Applications

  • Brand: Unbranded
Sold by:

10mm DC 5V 2-Phase 4-Wire Linear Stepper Motor with Long Lead Shaft Rod for Precision Movement Applications

  • Brand: Unbranded

€32.95

Save €10.00 (23%)

RRP

€42.95
In stock
FREE Shipping
Sold by:

€32.95

Save €10.00 (23%)

RRP

€42.95
In stock
FREE Shipping

We accept the following payment methods

Description

10mm DC 5V 2-Phase 4-Wire Linear Stepper Motor with Long Lead Shaft Rod for Precision Movement Applications

- The 10mm DC 5V 2-phase 4-wire linear screw stepper motor is designed for precise control in linear motion applications, ensuring accuracy and reliability in your projects. - Equipped with a long lead linear screw shaft rod, this product guarantees smooth and accurate movement, making it ideal for tasks requiring fine positioning. - Its 2-phase 4-wire configuration enables stable power transmission, resulting in efficient performance across a variety of automation tasks. - Compatible with a DC 5V power supply, this stepper motor seamlessly integrates into existing electrical systems, simplifying installation and setup. - Perfect for applications in robotics, CNC machines, and 3D printers, it delivers consistent performance in environments that demand controlled linear motion. - Whether you're building intricate robotic systems or precise CNC equipment, this linear screw stepper motor is the reliable choice for achieving your automation goals.
  • Fruugo ID: 377014040-815377433
  • EAN: 8135574184312

Delivery & Returns

Dispatched within 24 hours

  • STANDARD: FREE - Delivery between Fri 19 December 2025–Tue 06 January 2026 - FREE

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy

Product Compliance Details

Please see the compliance information specific to this product outlined below.

The following information is provided by the independent third-party retailer selling this product.

Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.

  • MagicMuse
  • Shenzhen Tumi Technology Co., Ltd.
  • 202-03, Jinhe Building, 8 Xinhe Street, Maan Tang, Bantian
  • Longgang, Shenzhen, Guangdong
  • China
  • Shenzhen
  • CN
  • 518129
  • pettynfnef@outlook.com
  • 13332965772

Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.

  • Synertrade FR SAS
  • Synertrade FR SAS
  • 9 rue du Bat d'Argent
  • Lyon
  • France
  • Lyon
  • FR
  • 69001
  • info@syner-sarl.cn
  • (+33)774555006
  • https://seller.kuajingmaihuo.com/settle/qualification-service